Pharma Plant Setup Checklist: 20 Things to Plan Before Construction
A pharmaceutical manufacturing project should not begin with a civil construction drawing. It should begin with a well-defined project strategy.
Before construction starts, the promoter needs clarity on what will be manufactured, at what capacity, where it will be manufactured, what regulatory requirements apply, what equipment and utilities are required, what the facility will cost, what approvals are required, how the facility will be validated and when commercial production will begin.
1. Define the Product Portfolio
Clearly identify the products to be manufactured. The product portfolio determines much of the plant's subsequent design.
2. Establish Manufacturing Capacity
Define annual production, batch size, number of batches, shifts, equipment capacity, product mix and future growth.
3. Prepare a Feasibility Study
Evaluate market, product, technology, capacity, land, CAPEX, operating cost, regulatory requirements, manpower and timeline.
4. Select the Site
Evaluate industrial zoning, land availability, power, water, drainage, effluent infrastructure, roads, logistics, labour availability and future expansion.
5. Decide Greenfield or Brownfield
Assess CAPEX, timeline, existing infrastructure, regulatory gaps, expansion potential and technical condition.
6. Prepare the Master Layout
Include production, warehouse, QC, QA, utilities, engineering, administration, personnel facilities, waste management and future expansion.
7. Define Material Flow Plan:
8. Define Personnel Flow
Plan entry, changing, gowning, production and exit according to the facility's contamination-control strategy.
9. Define HVAC Requirements
Establish room functions, temperature, humidity, pressure, airflow, filtration and contamination-control requirements.
10. Calculate Utility Requirements
Establish loads for electrical systems, HVAC, compressed air, water, steam, chilled water, cooling, process gases, drainage and effluent treatment.
11. Plan the Water System
Determine source, treatment, Purified Water requirements, WFI requirements where applicable, storage, distribution, sanitisation, monitoring and qualification.
12. Identify Major Equipment
Prepare an equipment list covering manufacturer, capacity, dimensions, utility requirements, electrical load, automation, cleaning, maintenance and qualification.
13. Plan the Warehouse
Define areas for raw materials, quarantine, approved materials, rejected materials, packaging, finished goods, returns, sampling and temperature-controlled storage.
14. Plan QC and QA
QC planning should cover analytical capabilities. QA planning should cover SOPs, documentation, deviations, CAPA, change control, validation, training and batch review.
15. Prepare the Regulatory Approval Matrix
List approvals applicable to the project, including drug manufacturing licence, pollution-control approvals, factory-related approvals, fire, electrical, local development, PESO where applicable, labour and product-specific approvals.
16. Appoint Consultants Early
Depending on the project, appoint architect, structural, civil, HVAC, electrical, plumbing, fire, process, validation and regulatory specialists.
17. Develop the GMP Philosophy
Define controls for contamination, cross-contamination, mix-ups, material movement, personnel movement, cleaning, environmental conditions and documentation.
18. Plan Qualification and Validation
Prepare qualification strategy for equipment, HVAC, utilities, water systems, processes, cleaning, analytical methods and computerised systems where applicable.
19. Prepare CAPEX and Project Schedule
Develop CAPEX for land, civil, HVAC, utilities, equipment, QC, warehouse, engineering and validation. Establish milestones from site and design through commercial production.
20. Plan Commercial Production
Ask what is required to produce the first compliant commercial batch. Plan manpower, SOPs, training, raw materials, packaging, QA/QC, validation, trial production and regulatory readiness.
Final Pre-Construction Checklist
Product portfolio; capacity; feasibility; site; Greenfield/Brownfield decision; master layout; material flow; personnel flow; HVAC; utilities; water system; equipment; warehouse; QC/QA; regulatory approvals; consultants; GMP philosophy; validation strategy; CAPEX/schedule; commercial readiness.
The Most Important Principle
Do not start construction before the major project decisions are sufficiently defined.
A well-planned pharmaceutical facility follows:
The cost of correcting a decision during planning is usually far lower than correcting the same decision after civil construction or equipment installation.
How Suchigo Consulting Can Help
Suchigo Consulting supports pharmaceutical manufacturers with Greenfield and Brownfield project planning, site coordination, engineering and utility planning, regulatory coordination, equipment advisory, qualification and production readiness.
The objective is to maintain continuity from project concept to commercial production, while specialist agencies undertake the relevant physical execution.